GEO5 Logiciel

Aide contextuelle

Tree
Settings
Program:
Langue:

FHWA GEC 010

The calculation of the vertical bearing capacity of the pile is performed in accordance with FHWA Standard GEC 010 - Drilled Shafts: Construction Procedures and Design Methods (September 2018), where all procedures are described in detail.

The calculation results in a pile base bearing capacity Rb and a pile shaft bearing capacity Rs.

Essayez GEO5 gratuitement.